March 16, 2010

Raising Walls




Rain or shine, the show must go on.

Per the engineering plans, re-bar had to positioned every 2 ft on most parts of the house and every 1 ft on the front of the house where we have more windows.


Miscellaneous pipes had to be added. Here is some of the plumbing.


Stem wall, bracing for pony walls and vent bucks.


Interior view shows preparation for the masonry wood stove. It's a big one and thus needs to have a separate footing.